We arrived at the construction site to find it pretty much empty, except for Mike the concrete guy. Our contractor was missing and Mike had no idea what we should work on. So we had to make our own busy work. We quickly noticed points of concern in the construction of twin home. In the kitchen we noticed that the location of the dishwasher was in a position behind the fridge in such a way that it would not allow for it to be opened. The fridge itself stuck out too far into the kitchen - the entire kitchen layout was not build to the original plans and specifications! We noticed that the ceiling still needed paint but all the light fixtures were installed. Their were holes in the walls that still needed spackle and most the puzzling was a strip of wooded L-channel attached to the base board that just looked terrible.
We got to work removing the light fixtures and removing cabinet doors in preparation for paint as well as filing the holes in the walls. Not to long after, our professor arrived, and we spent the next hour or so discussing designs for the next building, such as a built in captains bed, retractable ironing board and under the stairs storage.